OTC : BDGIF
-$1.07 (-1.7%)
OTC
Robert G. Blackadar
Engineering & Construction
Industrials
BDGIF
2807
CA
USD
1.05
1.34
1.27
0.04
0.28
$845.57M
2.12
6.82
185.71
0.34
$1.78
$60.22M
7.16%
9.79%
24.14%
8.13%
29.67
1.02
1.02
2/5
3 Analysts
%
4.85
5/9
$68.26M
$884.61M
$572.59M
$60.86M
$2.45B
2.44
12.13
1.34
24.14%
8.50%
3.37%
0.54%
$21.09
25 days
| Name | Title |
|---|---|
| Christopher Gunn | Senior Vice President of Sales, Marketing & Manufacturing |
| Connor Hanson | Corporate Controller |
| Anne Plasterer | Director of Investor Relations |
| Julie Lee | Chief Human Resources Officer |
| Pradeep Atluri | Vice President of Information Strategy & Technology |
| Reid Yester | Vice President of Legal, General Counsel & Corporate Secretary |
| Robert G. Blackadar | Chief Executive Officer, President & Director |
| Robert Dawson | Chief Financial Officer |
| Lisa Gigic | Manager of Corporate Finance & Investor Relations |
| Logan Mellott | Chief Operating Officer |
No votes yet today — be the first to share your view!
About Badger Infrastructure Solutions Ltd. (OTC:BDGIF) Stock
Badger Infrastructure Solutions Ltd., operating across Canada and the United States, specializes in delivering non-destructive excavation services and a comprehensive suite of related infrastructure solutions. At the core of its operations is the proprietary Badger Hydrovac technology, which employs a pressurized water stream to safely disintegrate and remove soil, minimizing environmental impact and damage to underground utilities. The company offers a diverse range of applications, including precision excavation for visual confirmation of buried lines (daylighting and potholing), creating test holes for directional drilling and subsurface utility engineering, and facilitating pipeline and utility crossings. It also handles debris removal from various sites, such as frac tanks, road and b ... ox culverts, and pipe-rammed casings, alongside general material removal from inside structures. Furthermore, Badger provides crucial support for pipeline projects, performing excavations for crossings, tie-ins, hydro probing, addressing utility conflicts, and responding to oil and fuel spills. It also constructs service repair pits for gas, electric, water main, and telecom line maintenance. Additional specialized services include the installation of anodes and shoring, tank cleanouts, and various trenching operations like slot trenching and exposing existing cables or conduits. The company is also proficient in digging pole and piling holes for a wide array of uses, from utility and traffic signal poles to light standards and well monitor installations. Beyond excavation, Badger Infrastructure Solutions offers extensive inspection and maintenance services for pipelines and sewers, encompassing air and mandrel testing, CCTV inspections, laser profiling, flushing, cleaning, and locating mainline and lateral lines. They also conduct reaming and concrete removal, sewer and main line locating, and smoke testing for sewers, in addition to providing disaster response and general locating solutions. Founded in 1992 and headquartered in Calgary, Canada, the company rebranded from Badger Daylighting Ltd. to Badger Infrastructure Solutions Ltd. in May 2021.
Badger Infrastructure Solutions Q2 Earnings Call Highlights
2026-08-01 04:04:02
Badger Infrastructure Solutions TSE: BDGI reported record second-quarter results, with revenue rising 23% year over year to CAD 257 million and adjusted EBITDA increasing 25% to CAD 66.1 million, as broad demand across infrastructure, industrial and construction markets supported higher fleet utilization and pricing.
Badger Announces Closing of C$300 Million Senior Unsecured Note Offering
2026-05-14 10:34:00
CALGARY, Alberta, May 14, 2026 (GLOBE NEWSWIRE) -- Badger Infrastructure Solutions Ltd. ("Badger", the "Company", "we", "our" or "us") (TSX: BDGI) announced today it has closed its previously announced private placement offering (the "Offering") of $300 million aggregate principal amount of 5.375% senior unsecured notes due May 14, 2031 (the "Notes"). The Offering was underwritten by a syndicate of underwriters led by CIBC World Markets Inc. and TD Securities Inc., as joint bookrunners. Norton Rose Fulbright Canada LLP served as legal counsel to Badger in connection with the Offering. Badger will use the net proceeds from the Offering to repay indebtedness under its credit facilities, including its term facility.
Frequently Asked Questions
What is the current Badger Infrastructure Solutions Ltd. (BDGIF) stock price?
Badger Infrastructure Solutions Ltd.(OTC:BDGIF) stock price is $62 in the last trading session. During the trading session, BDGIF stock reached the peak price of $70.12 while $36.67 was the lowest point it dropped to. The percentage change in BDGIF stock occurred in the recent session was --1.7% while the dollar amount for the price change in BDGIF stock was -$1.07.
BDGIF's industry and sector of operation?
The OTC listed BDGIF is part of Engineering & Construction industry that operates in the broader Industrials sector.
Who are the executives of BDGIF?
Christopher Gunn
| Senior Vice President of Sales, Marketing & Manufacturing
Connor Hanson
| Corporate Controller
Anne Plasterer
| Director of Investor Relations
Julie Lee
| Chief Human Resources Officer
Pradeep Atluri
| Vice President of Information Strategy & Technology
How many employees does BDGIF have?
Number of BDGIF employees currently stands at 2807. BDGIF operates from 919-11th Avenue SW, Calgary, AB T2R 1P3, CA.
Link for BDGIF official website?
Official Website of BDGIF is: https://www.badgerinc.com
How do I contact BDGIF?
BDGIF could be contacted at phone #877 322 3437 and can also be accessed through its website. BDGIF operates from 919-11th Avenue SW, Calgary, AB T2R 1P3, CA.
How many shares of BDGIF are traded daily?
The average number of BDGIF shares traded daily for last 3 months was 11.15K.
What is the market cap of BDGIF currently?
The market value of BDGIF currently stands at $2.09B with its latest stock price at $62